A commercial multispectral satellite answers to more regulators than almost any other small mission. It transmits, so it needs the FCC. It images the Earth for commercial purposes, so it needs a remote sensing license. Its payload and bus are export controlled, and its frequencies have to be registered internationally. Miss one and the satellite can be finished, integrated and still unable to launch or sell a single image.
This guide covers every authorization a US operator of a commercial multispectral or hyperspectral Earth observation satellite needs, in the order you will need them. It also covers what each one takes, how long it runs, and what you owe once you are in orbit. It applies to a single CubeSat as much as to a constellation.
Who regulates a commercial multispectral satellite
Five bodies have a say, and each one regulates a different part of the mission.
- The FCC licenses your radio transmissions: telemetry, command and the payload data downlink, plus your ground stations.
- NOAA, through the Commercial Remote Sensing Regulatory Affairs office now housed with the Office of Space Commerce, licenses the imaging itself.
- The State Department (ITAR) and the Commerce Department (EAR) control the export of your spacecraft, payload and technical data.
- The ITU records your frequencies internationally, through filings the FCC makes on your behalf.
- The FAA licenses the launch. Your launch provider holds that license, but your satellite goes through its payload review.
For the wider picture across all mission types, see US satellite regulations explained.
The licenses you need, in the order you need them
1. Export classification (start at design review)
Classify the spacecraft and payload before you choose suppliers or share drawings abroad. Remote sensing spacecraft are among the few satellites the ITAR describes by performance. USML Category XV(a)(7) captures electro-optical systems above set thresholds for aperture, number of spectral bands and ground sample distance, with separate thresholds for hyperspectral instruments. Spacecraft below those thresholds generally fall under the EAR, typically ECCN 9A515, with the optics, detectors and other components classified line by line. The classification decides whether foreign engineers can work on the payload, whether you can sell abroad and which licenses you need to do either. Getting it wrong is easy, as we set out in COTS component export controls and the valuation trap.
2. FCC authorization (file 12 or more months before launch)
Every satellite that transmits needs FCC authorization before launch, and a commercial imaging business needs a commercial license. In July 2026 the FCC adopted Part 100, which replaces the Part 25 satellite rules with certification against performance standards, modular application forms and firm review timelines. The Space Bureau is issuing guidance on the transition, so check which rules your application falls under when you file. A Part 5 experimental license is quicker for a technology demonstrator, but it is not designed for selling data, a limit we covered in experimental license commercial data and the monetization trap. Your application covers frequencies, power, orbit and an orbital debris showing, including disposal within five years of mission end. Your ground stations, or your ground station provider’s, need their own authorization. For the step-by-step process, see how to get a satellite license in the US.
3. NOAA remote sensing license (apply once the design is stable)
Any person subject to US jurisdiction needs a NOAA license to operate a private remote sensing space system, including a US company operating from abroad. The rules are in 15 CFR Part 960. NOAA places each system in a tier based on whether comparable data is already available from foreign competitors: the more novel your capability, the more conditions your license carries. Once NOAA deems an application complete, it must issue a determination within 60 days. There is no filing fee, and the license lasts for the operational life of the system. Getting to “complete” is where time goes, which is why we called the 60-day clock an illusion. If you are unsure whether your instrument needs a license at all, NOAA’s initial contact form is the fastest way to find out.
4. ITU filings (through the FCC, early)
Your frequencies only have international standing once they are filed with the ITU. The FCC submits the filings, but you supply the technical data and carry the coordination. Earth observation downlinks often use Earth exploration-satellite service bands shared with other operators, so file early. The ITU filing also starts the clock on bringing those frequencies into use.
5. Launch and payload review (with your launch provider)
Your launch provider holds the FAA license, but it needs your licenses to fly you. Expect to provide your FCC and NOAA authorizations, or evidence they are in hand, before integration. A satellite missing either one can lose its slot on the manifest.
After launch: what you owe each regulator
Licensing is the start of your obligations, not the end. Under your FCC authorization you will meet the reporting and operating conditions in your grant and carry out your disposal plan. Your NOAA license requires an annual compliance certification, reporting of anomalies (including significant deviations from your orbit or data collection characteristics), and approval of changes to material facts before you make them. A new spectral band, a sharper sensor on the next satellite or a new foreign data customer can all count. Export controls apply every time you share technical data with a foreign partner or sell a satellite or payload abroad.
Frequently asked questions
What are the regulatory requirements for operating a commercial multispectral satellite?
In the US: FCC authorization for the satellite and its ground stations, a NOAA commercial remote sensing license, export classification under the ITAR or EAR (with licenses for any foreign transfers), ITU filings made through the FCC, and a payload review through your launch provider’s FAA license.
Does a multispectral CubeSat need a NOAA license?
If it is operated by a person subject to US jurisdiction and images the Earth for commercial purposes, generally yes. Instruments with other primary purposes are decided case by case, so use NOAA’s initial contact form if you are unsure.
How long does NOAA take to license a remote sensing satellite?
NOAA must decide within 60 days of deeming an application complete. Preparing a complete application, and any consultation before it, usually takes longer than the review itself.
How much does a NOAA remote sensing license cost?
NOAA charges no filing or maintenance fee. The costs are internal time and, for most operators, regulatory counsel.
Is a multispectral satellite ITAR controlled?
It depends on its performance. Electro-optical and hyperspectral spacecraft above the thresholds in USML Category XV(a)(7) are ITAR controlled. Many small satellite systems fall below them and are controlled under the EAR, typically ECCN 9A515. Classify each component, not just the spacecraft.
Can I sell imagery from a satellite licensed as experimental?
Part 5 experimental licenses are intended for research and testing, not commercial service. If imagery sales are part of the business case, plan for a commercial FCC license.
Stay ahead of changes
These rules keep moving, and more change is coming: Part 100 transition guidance from the FCC, possible changes to remote sensing licensing, and ongoing revisions to the export control lists. The free Astrolytics regulatory feed tracks every change from the FCC, NOAA, DDTC, BIS and the ITU, rated for impact on your mission. Get the free regulatory feed.
